
Laying the D-245 crankshaft
Before assembly, each crankshaft must be checked on a magnetic or ultrasonic flaw detector for the absence of micro and macro cracks; and also for compliance of the selected set of main bearing shells with the size of the main journals

ZIL-5301 engine coolant pump
The design of the liquid pump is shown in the figure.
The liquid pump body as an assembly must be tested with water under a pressure of 0.2±0.01 MPa for 2 min. In this case, no leaks or drops are allowed.

Before checking the installation of the front wheels, check and, if necessary, adjust the axial clearances in the hub bearings and bring the tire pressure to normal

Features of ZIL-5301 brakes
ZIL-5301 vehicles are equipped with a combined pneumatic-hydraulic brake drive with two independent hydraulic and pneumatic circuits, divided into two circuits