• Auto-hand
    • Lada Granta
    • Lada Kalina
    • VAZ-2121
    • Lada-Largus
    • Lada Priora
    • Lada Vesta
  • separator
    • GAZ-66
    • GAZ-2705
    • GAZ-3110 (Volga)
  • Separator-2
  • Engines
    • UAZ 3151
    • Niva Chevrolet
    • ZIL-5301
    • MAZ
    • Ural car
    • ZIL-131
    • Auto PAZ
    • Kamaz
  • Separator-3
  • Systems
  • separator-4
  • search

Select your language

  • Русский
  • Қазақша (kk-KZ)
  • Українська (Україна)
  • Español (España)
  • German (DE)
  • English (UK)

Running-in and testing of the D-245 diesel engine

During major repairs, diesel engines must undergo cold and hot running-in, acceptance testing, technical inspection, and organoleptic testing

  1. Setting the ignition timing of diesel D-245E3
  2. Voltage regulator ZIL-5301
  3. Removal and disassembly of the ZIL-5301 gearbox
  4. ZIL-5301 door drive diagram
  5. Removal and disassembly of springs ZIL-5301
  6. Removing the ZIL-5301 gearbox in field conditions
  7. Injector D-245
  8. Rear hubs of the ZIL-5301 vehicle
  9. Assembly and installation of the boost corrector ZIL-5301
  10. Assembly, installation of gearbox ZIL-5301
  11. Drive axle ZIL-5301
  12. ZIL-5301 diagram with Euro 2 add-on
  13. Cylinder head installation D-245
  14. Features of diesel engine D-245
  15. Electrical diagram of ZIL-5301
  16. Bleeding the brake system ZIL-5301
  17. Checking the ZIL-5301 tie rod joints
  18. Steering gear ZIL-5301 removal
  19. Longitudinal and transverse section of the D-245 engine
  20. Technical characteristics of the ZIL-5301 gearbox

Page 119 of 288

  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123