Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
Adjustment of backlashes of valves of the engine G4KD and 2,4 l. – G4KE
Checking and adjusting the valve clearance must be done on a cold engine (coolant temperature 20˚С), with the cylinder head mounted on the block
- Cylinder heads Kamaz
- The design of the power supply of the diesel engine KAMAZ-740.30-260
- Malfunctions of the VAZ-21114 engine
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Main parameters and characteristics of YaMZ-238 engines
- Maintenance of the K-151 carburetor
Page 2 of 13