Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
- Assembling the engine of the car GAZ-66, GAZ-53
- Cylinder head ZMZ-402 GAZ-2705
- Gas distribution mechanism Kamaz
- Tightening torques for KAMAZ 740.11-240 diesel connections
- The design of the power supply of the diesel engine KAMAZ-740.30-260
- Technical characteristics of the KAMAZ 740.11-240 engine
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Assembly of the cylinder block of the G4KD and G4KE engine
- Engine KAMAZ
- Continuation of article 2 assembly of the YaMZ-236/238 diesel engine
Page 7 of 26