Assembling the engine of the car GAZ-66, GAZ-53
To assemble the engine, as well as to disassemble it, the engine cylinder block assembled with the clutch housing is fixed on a stand (see Fig. 1)
Before assembly, all engine parts are selected according to size, thoroughly washed, blown with compressed air and wiped with clean napkins
Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Gas distribution mechanism Kamaz
- Removal and disassembly of the G4KD and G4KE cylinder block
- Engine KAMAZ
- Adjustment of backlashes of valves of the engine G4KD and 2,4 l. – G4KE
- The design of the power supply of the diesel engine KAMAZ-740.30-260
Page 4 of 13