Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
Malfunctions of the VAZ-21114 engine
Let's consider the malfunctions that may occur during engine operation:
- - The crankshaft is not turned by the starter;
- Operation of the YaMZ-238 double-disk clutch
- Assembly of the cylinder block of the G4KD and G4KE engine
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Ignition system engine 402 GAZ-2705
- Adjustment of backlashes of valves of the engine G4KD and 2,4 l. – G4KE
- Characteristics of engines KAMAZ-740.50-360, KAMAZ-740.51-320
Page 1 of 13