Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
Operation of the YaMZ-238 double-disk clutch
The clutch of the YaMZ-238 model is double-disc, dry, friction type, with a peripheral arrangement of cylindrical springs
- Technical characteristics of cars GAZ-66, GAZ-53
- Ignition system engine 402 GAZ-2705
- Malfunctions of the pneumatic actuator of the KamAZ brakes
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Main parameters and characteristics of YaMZ-238 engines
- Removal and disassembly of the G4KD and G4KE cylinder block
Page 1 of 13