
Work is performed on a lift or inspection pit
Secure the engine cooling system radiator to the front crossmember of the engine compartment with straps (technological belts)

We remove the fuel rail to replace the injectors and to clean the fuel rail, as well as when repairing the cylinder head
We prepare the car for the work.

It is advisable to check the fluid level in the expansion tank of the cooling system during each inspection of the car before leaving and necessarily in the event of engine overheating and the associated release of fluid from the system

We replace the replaceable element of the engine air filter during the next maintenance after 15 thousand km of run