Diesel timing gear D4EA
Checking the technical condition of the timing drive
Remove the top cover.
Check the timing belt (A) for damage, oil or coolant ingress
Continuation of article 2 assembly of the YaMZ-236/238 diesel engine
Installing cylinder heads, valve rocker arms and adjusting valve clearances
The cylinder head mounting studs are screwed into the right and left rows of the cylinder block, having previously lubricated the threaded holes for the studs in the block with diesel oil
- Operation of the YaMZ-238 double-disk clutch
- Timing drive in a 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Tightening torques for KAMAZ 740.11-240 diesel connections
- Removal and installation of the cylinder head of the 2.0 liter engine. - G4KD and 2.4 liters. – G4KE
- Main parameters and characteristics of YaMZ-238 engines
- Malfunctions of the pneumatic actuator of the KamAZ brakes
Page 7 of 13