Cylinder head tightening and valve adjustment D-245E3
Checking the tightening of the cylinder head mounting bolts
Check the tightening of the cylinder head mounting bolts after the break-in period and every 40 thousand km of run on a warmed-up diesel engine in the following order:
Design of the fuel system of KAMAZ 740.11-240, 740.13-260, 740.14-300 engines
The fuel supply system ensures fuel purification and uniform distribution among the engine cylinders in metered portions and at strictly defined moments in time
Page 7 of 13