Repair of the cylinder head is carried out during general engine repairs and when replacing the cylinder head gasket

It is very important to repair the head after the motor has overheated.

During overheating, defects may occur that may not be visually visible.

Therefore, all operations to repair the cylinder head must be carefully carried out.

In many ways, the operation of the engine depends on this. And this will save you from unnecessary work and costs.

Removing the cylinder head, see the article - "Replacing the cylinder head gasket".

Disassembly

Replacing the head gasket ZMZ-406 GAZ-3110

Unscrew the nuts 1 and remove the screen 5 of the phase sensor, the bracket 2 for lifting the engine and the exhaust manifold 6.

Remove the exhaust manifold gaskets.

Remove bolt 3 and remove the 4th phase sensor.

Unscrew emergency oil pressure sensors 7 and oil pressure indicator 8.

Replacing the head gasket ZMZ-406 GAZ-3110

Loosen the clamp 1 and remove the hose from the idle air control pipe.

Unscrew nuts 2 and remove reservoir 3 from the inlet pipe.

Remove the receiver gasket.

Replacing the head gasket ZMZ-406 GAZ-3110

Unscrew nuts 1 and remove intake pipe 2 together with injectors and fuel line (not shown in the photo).

Remove the intake pipe gasket.

Replacing the head gasket ZMZ-406 GAZ-3110

Replacing the head gasket ZMZ-406 GAZ-3110

Remove the screws 1 and remove the back cover 2 of the block head.

Replacing the head gasket ZMZ-406 GAZ-3110

Remove cover gasket

Replacing the head gasket ZMZ-406 GAZ-3110

Remove the hydraulic pushers 1 of the valves. It is more convenient to remove hydraulic pushers with a magnet or suction cup

Hydropushers cannot be interchanged, so before removing them, they must be marked so that they can be installed in their place during assembly.

Store hydraulic tappets in the same position as they are on the valves so that oil does not leak out of them.

Replacing the head gasket ZMZ-406 GAZ-3110

If the design of the puller does not provide for a valve stop, place a suitable stop under it.

Compress the springs with a cracker.

Replacing the head gasket ZMZ-406 GAZ-3110

To make the plate of springs come off the crackers more easily, you can apply a light blow with a hammer on the hard bipod of the cracker.

Replacing the head gasket ZMZ-406 GAZ-3110

We take out two crackers with tweezers and smoothly release the springs.

Replacing the head gasket ZMZ-406 GAZ-3110

Remove the top plate and two valve springs.

Replacing the head gasket ZMZ-406 GAZ-3110

Remove the oil seal with a puller

Replacing the head gasket ZMZ-406 GAZ-3110

Pry off with a screwdriver and remove the support washer 1 of the valve springs.

Replacing the head gasket ZMZ-406 GAZ-3110

Turn over the cylinder head and remove the valve, marking the place of its installation, so that during subsequent assembly the valve will return to its original place.

Similarly, remove and mark the rest of the valves.

Replacing the head gasket ZMZ-406 GAZ-3110

Worn valve guides are pressed out with a mandrel

Replacing the head gasket ZMZ-406 GAZ-3110

Using an 8 hex wrench, we unscrew the plugs of the oil channels

Inspection, Troubleshooting and Repair

  • 1. After disassembling the block head, rinse all parts in gasoline, wipe and dry. Clean the combustion chambers and valves from carbon deposits.
  • 2. Check the block head. If there are cracks on the jumpers between the valve seats, traces of burnout and cracks on the walls of the combustion chamber, replace the block head.
  • 3. Check with a metal ruler and feeler gauges whether the flatness of the surface of the head adjacent to the block is broken.

To do this, put the ruler with an edge on the surface of the head of the block, in the middle, along and then across and measure the gap between the surface of the head and the ruler with a probe.

If the gap exceeds 0.1 mm, replace the head.

  • 4. Check clearances in camshaft bearings.
  • 5. Check the clearances between the valve lifters and the channels for the hydraulic pushers in the block head.

The gap is calculated as the difference between the diameter of the channel and the diameter of the hydraulic pusher.

The nominal diameter of the channel for the hydraulic pusher is 35.0 +0.025 mm, the maximum allowable diameter is 35.1 mm.

The nominal diameter of the hydraulic pusher is 35.0–0.025 and 35.0–0.041 mm, the maximum allowable diameter is 34.95 mm.

The maximum allowable gap is 0.15 mm. If the gap exceeds the specified value, replace the hydraulic pusher. If this does not give a positive result, replace the block head.

  • 6. Check valves. If cracks are found on the working chamfer of the valve, warping of the valve head, burnout, deformation of the stem, the valve must be replaced.

Minor scratches and scratches on the valve face can be removed by lapping.

Lapping the valve to the seat is done as follows:

  • - insert the valve into the block head;
  • - put a valve grinding tool on the valve stem;
  • - apply a thin layer of lapping paste, which is a mixture of fine abrasive powder with engine oil, to the working chamfer of the valve;

- turn the valve with the help of the device in both directions, periodically pressing it against the seat.

An external sign of satisfactory lapping is a solid matte gray color of the working facet of the seat and valve.

After lapping, wipe the seat and valve with a clean cloth and rinse thoroughly to remove any remaining lapping paste. To check the tightness of the valve, install it in the head of the block along with springs and crackers.

After that, put the head of the block on its side and pour kerosene into the channel closed by the valve.

If within 3 minutes. kerosene will not seep into the combustion chamber, the valve is considered sealed.

  • 7. Check the condition of the valve springs. Springs that are bent or cracked or broken should be replaced.

Replacing the head gasket ZMZ-406 GAZ-3110

8. Check the condition of the valve seats.

The seat bevels must be free of wear, pitting, corrosion, etc. Minor damage (small risks, scratches, etc.) can be removed by lapping the valves.

Stronger defects can be eliminated by grinding. When grinding, keep the dimensions of the saddle indicated in the fig.

Motor valve seat profile mod. 4062.

After grinding, check the runout of the seat chamfer against the hole in the valve guide, limit o allowable runout 0.05 mm.

After grinding, grind the valves. Then thoroughly clean and blow out the head of the block with compressed air so that no abrasive particles remain in the channels closed by valves and in the combustion chambers.

It should be noted that after grinding the seat, the valve sits deeper in the seat.

Therefore, after grinding, you need to measure the distance between the end of the valve stem pressed against the seat and the axis of the camshaft.

If this distance is less than 35.5 mm, replace the block head, as in this case the normal operation of the valve lifters is disrupted.

Check clearances between guide bushings and valves. The clearance is calculated as the difference between the diameter of the hole in the sleeve and the diameter of the valve stem.

The maximum allowable gap is 0.2 mm. If the clearance is greater than specified, replace the valve and guide sleeve.

The old bushing is pressed out with a mandrel from the side of the combustion chamber.

Install new bushings with retaining rings put on them until the retaining ring stops in the plane of the block head from the side of the hole for the hydraulic pushers.

Before installation, the bushings must be cooled to -40-45°С, and the block head must be heated to a temperature of +160-175°С.

The bushing should be inserted into the head of the block freely or with little effort.

For spare parts, valve guides are supplied in three repair sizes.

First overhaul with 0.02 mm increase in bushing outer diameter.

The second one has the outer diameter of the sleeve 14.2 +0.053 and 14.2 +0.040 mm, the third one has a diameter increased by 0.02 mm from the second size.

When installing bushings of the first repair size, do not bore the hole for the bushing in the head of the block.

When installing bushings of the second and third repair sizes, it is necessary to bore the hole to a diameter of 14.2–0.023 and 14.2–0.050 mm.

After installing new bushings, expand the hole for the valves in them to the dimensions indicated in table. 2.1.

Then grind the valve seats as above.

In order to check the block head for cracks, you need to bring a hose for supplying compressed air to one of the holes in the cooling jacket.

Close all holes in the head with wooden plugs. Immerse the head in a bath of water and apply compressed air at a pressure of 1.5 atm.

In places where there are cracks, air bubbles will come out.

Replacing the head gasket ZMZ-406 GAZ-3110

Having cleaned the mating surface of the head, we check the quality of the fit of the head to the block with a curved ruler.

If the deformation exceeds 0.05 mm, the flatness must be restored by machining, however, if the non-flatness exceeds 0.1 mm, the head cannot be repaired.

We wash the head with kerosene or diesel fuel, clean the oil channels from deposits.

Then we wipe the surfaces with a clean rag and blow the channels with compressed air.

Reinstall the oil channel plugs.

Replacing the head gasket ZMZ-406 GAZ-3110

We press in new valve bushings through an aluminum spacer, preheating the head to 160–180°C and cooling the bushings in “dry ice” (CO 2 ).

We install the valves in the reverse order of removal, replacing the old valve stem seals with new ones

Lapping valves

Replacing the head gasket ZMZ-406 GAZ-3110

Apply lapping paste to the bevel of the valve and install it in the appropriate head sleeve.

Replacing the head gasket ZMZ-406 GAZ-3110

We fix the lapping tool on the valve stem and, pressing the valve against the seat, turn it in both directions by about 90 °.

Replacing the head gasket ZMZ-406 GAZ-3110

Continue lapping until the sealing chamfer of the valve completely over its entire width and length becomes matte and clean

The chamfer on the valve seat should also look like this.

We wipe the rest of the paste with a rag from the valve and seat.

Assembling the cylinder head ditch in reverse order.