Disconnecting the battery terminals

Using a 27 key, unscrew the drain plug and drain the oil from the engine crankcase. Putting the cork in place

With the same key, unscrew the plug and drain the oil from the power steering system. Putting the cork in place

Disconnect the plug connector of the front lights and direction indicators

Disconnect the wires from the starter

Removing and installing the Kamaz power plant

3. Disconnect the terminals from the generator.

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

  • 4. Disconnect the terminals from the temperature sensor
  • 5. We disconnect the terminals of the switch of the emergency oil pressure warning lamp and the full-flow filter clogging indicator;

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

  • 6. Disconnect the pump rack control rod
  • 7. We substitute a container under the drain tap and drain the coolant

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

  • 8. We loosen the clamps of the upper coolant outlet pipe to the radiator and remove the pipe
  • 9. We unscrew the pipe for supplying coolant to the pump, or loosen the clamps and disconnect the pipe.

Removing and installing Kamaz power plant

10. Disconnect the expansion tank supply pipe to the radiator

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

  • 11. We loosen the pipe clamp and disconnect the supply hose to the cab heater
  • 12. Disconnect the inlet and outlet hoses to the oil coolers

Removing and installing Kamaz power plant

13. Disconnect the fuel inlet and outlet hoses from the injection pump

Removing and installing Kamaz power plant

14. Disconnecting the tube from the compressor

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

16. Unscrew the fan mounting bolts and remove it

Using keys 13 and 19, loosen the clamp and disconnect the air duct from the air cleaner.

We unscrew the bolts of the clamps securing the air cleaner to the bracket.

Remove the air cleaner

Removing and installing Kamaz power plant

18. We bend the locking plates and unscrew the bolts securing the manifolds of the exhaust system

Removing and installing Kamaz power plant

20. We unscrew the front cushions of the power unit

Rear bracket for removing the Kamaz engineRemoving and installing Kamaz power plant

  • 19. We connect the hoist by the eyebolts
  • 21. Unscrew and disconnect the cardan

Removing and installing Kamaz power plantRemoving and installing Kamaz power plant

  • 17. Disconnecting the CCGT
  • 23. Unscrew and remove the traverse

Removing and installing KamAZ power plant

24. We unscrew and remove the spacer rod of the frame

We hook the hooks of the lifting and transport device on the eyebolts, hang the engine and, moving it forward, disconnect it from the gearbox

Raise the engine above the frame, turn it 90° to the left and move it to the stand

To move the engine forward more freely, it is recommended to first remove the front cover of the full-flow oil filter

The power plant is installed in the reverse order.