Vacuuming the air conditioning system and removing the VAZ-2123 compressor

Vacuuming the air conditioning system is necessary when changing the refrigerant or replacing faulty or damaged parts of the air conditioning system

The refrigerant in the system is under high pressure, so when discharging the system, it is necessary to take precautions.

Vacuuming the air conditioning system and removing the VAZ-2123 compressor

To bleed the refrigerant from the air conditioning system unscrew the protective cap of the low-pressure pipeline valve.

Discharge of the air conditioning system and removal of the VAZ-2123 compressor

Using a special key for a tire valve, unscrew the valve core, bleeding the refrigerant from the system.

Discharge of the air conditioning system and removal of the compressor VAZ-2123

Also bleed the pressure in the system from the high-pressure pipeline valve

After the system is discharged, tighten the valve spools

Removing the air conditioning compressor

Remove the compressor for replacement or repair.

In order to remove the compressor, you need to bleed the pressure in the air conditioning system.

After that, remove the front mudguard of the engine compartment for this:

Removing the air conditioner compressor

Using a 13 mm socket, unscrew the four pan mounting bolts

Removing the air conditioner compressor

Removing the protection

Removing the air conditioner compressor

Using an 8 mm socket, unscrew the five screws.

Removing the air conditioning compressor

Remove the front mudguard.

Remove the air conditioning compressor drive belt for this:

Removing the air conditioning compressor

Using a 13 mm head, loosen the two bolts securing the tension roller bracket

Removing the air conditioning compressor

Using a 13 mm head, turn the adjusting bolt counterclockwise to loosen the belt

Removing the air conditioning compressor

Remove the belt from the tension roller and compressor and crankshaft pulleys

Removing the air conditioning compressor

When installing the belt on the compressor pulley, put it on so that it is located closer to the inner edge of the pulley

After this;

Removing the air conditioning compressor

Using an 8 mm Allen key, unscrew the screw of the air conditioning compressor hose mounting plate.

Remove the mounting plate and hoses.

The connection of the hose tips and the compressor is sealed with rubber rings.

The diameters of the fittings of the outlet and inlet hoses are different, so the mounting plate is installed in one position

Removing the air conditioning compressor

Using a 13 mm socket, unscrew the three bolts securing the compressor to the cylinder block bracket.

Removing the air conditioning compressor

We move the compressor away together with harness from the cylinder block bracket

Disconnect the harness connector from the compressor connector

Removing the air conditioning compressor

Install the compressor in the reverse order. After that, charge the air conditioning system.